With over 55 years of experience metal sales is the nation s largest manufacturer of metal roofing wall and building systems.
Metal roof gable trim detail.
The peak of your metal roof needs a different trim from the gables.
Gable trim designed to finish off the edge of the roof gable or rake.
I ll make a mark in line with the face and the back of the fascia to create my bend lines.
The gable trim combined with sealant provides a watertight seal for your roof system.
For the corner detail at the eave mark the gable trim and then make a series of simple folds so that when you look at the corner of the roof it is clean and boxed in.
It is designed for maximum effectiveness and aesthetics.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Gable rake trim installation subscribe to our page for more metal roofing videos.
Striations and bends on the flashing provide strength and match the lines of your other edge trims.
Explore our products today.
The edge of your metal roof needs a different trim than the peak of your metal roof.
Gable trim buy metal roofing direct 10 long length 26 gauge metal installs at the rake end of the roof matches the color of the panel use with tacky tape.
Trim is an important element of roof assembly as each different section of metal roofing will require a trim specific to that area.
Make a 1 mark from the edge on top of the gable trim.
Do not step on panel ribs or on trim pieces to prevent kinking.
Here at 1st coast metal roofing supply we value our customer service and p.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
How to cut and finish gable trim at the eave of a metal roof make a 3 mark from the edge on top of the gable trim.
Gable rake trim gable or rake trim is attached to the sloping edges of roof gables to prevent wind driven rain from penetrating the exposed undersides of the roof panels that connect the ridge and the eave of your home.
Fold the side in first then fold the top down and close off this hole.
Add up the total amount of gable of the roof and divide by 9 5 10 long length.
Using t bevel which was previously locked to the pitch of your roof mark a line on the drip edge side of the gable up to the 3 mark.
How many do i need.
Roof pitch the metal roofing panels shown in this manual require a min imum slope of 2 สบ per foot to ensure proper drainage.