Request a quote today.
Metal roof deck edge detail.
These formed galvanized angles are used to create a stopping point for poured concrete.
Just email your materials list for a quote.
To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Drain post target.
Pac snap edge extended fascia.
Mbci manufactures the highest quality metal roofing wall panels to meet your project s aesthetic structural standards.
Edge form pour stop.
Coated metal wall scupper.
Coated metal roof edge.
However it can be butted or lapped more than 2 to.
The details and written instructions described in this manual are suggested installation methods to.
Girts and roof deck the substructure to which the metal panels are fastened must.
Also for exposed fastener panels wall panels tiles soffit fascia copping.
Roof pitch the metal roofing panels shown in this manual require a mini.
Edge form and pour stop for metal deck can be fabricated to custom sizes and gauges.
Download free high quality cad drawings blocks and details of metal decking organized by masterformat.
Concealed wood equipment support.
Roof deck is typically installed to endlap approximately 2 over supports.
Conical pipe boot split.
Drain pre.
At the gable edge use a gable or sidewall flashing.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Conical pipe boot non split.
Coated metal joint detail.
Metal roofing specifications cad pdf drawings testing bim.
Case studies white papers.
Curb type tie in at flat roof.
Skip to main content shop.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
Cellular deck is made by attaching a bottom steel sheet to a roof deck or composite floor deck panel.
These sizes are available for immediate pick up or delivery.
Eter support of the deck is necessary to limit edge deflection in the.
Change of deck plane.
At the gable edge use a gable or sidewall flashing.
Cellular deck can be used.
Eave detail w gutter 2.